Pre-Wire/Rough-In

our process:
Simple and transparent.

PRE-WIRE AND ROUGH-IN
When the interior walls have been framed, the physical work begins. Osbee sends its wiring team to pull wires throughout the site. Concurrently, the rough-in includes installation of speaker and touch-panel brackets and low-voltage wall boxes.

WHEN: When interior framing is complete and before walls are closed

GOAL: To install the wiring and prepare for the trim phase

parties involved: Contractor and Electrician; HVAC Contractor, Alarm Contractor, and Pool Contractor depending on systems being involved; (Client optional)